Jenny Lind/Rancho Calaveras 4/2007 - Status Report
Installing
a new Ethernet radio
Setting
up Communications to F Tank and LaContenta WWTP
Installed
soft starts for pumps to reduce water hammer
Installed a new transfer switch for generator. Added
features for over current/voltage
Undercurrent/voltage
and spikes
Installed
new
Installing
a new control panel
Hired Design Engineer Consultant to design
Project
designed for 2700 feet of line 12” diameter pipe.
Alternative
bid for 7200 feet of line 12” diameter pipe.
.
Reestablishing B Zone
Constructing
PRV on Anderson and Yost
Constructing
PRV on Westhill and Garner
Cal
Trans has reviewed plans for permit.
Received Cal Trans encroachment permit.
Received County encroachment permit.
Bid
documents prepared.
Prebid
Bid
Date:
Award
Date:
Construction
should be completed by summer 2007.
· Tank under construction
· Approximately 2-month
construction. Tank completion April 2007
Tank
color is Hydro Blue
Lettering
to say, “Welcome to Valley Springs”
· OES approved
90-day time extension to
· Rebuilt one PRV. Need to
rebuild 7 more.
· Performed Preventative Maintenance (PM) on PRV’s
·
· Began flushing entire Jenny Lind system
· Pipeline work completed
Pressure
change notification to residents
Control panel submittals reviewed (60 day
delivery time)
Building completed
PG & E upgrade released for construction
(Single Phase to Three Phase)
Filter
delivered and installed
Filter
building built
Programming
already started
VFD’s
for Raw Water installed
Filter
startup
Solids
handling startup August 2007
DOHS
Permit Amendment complete. Draft under review
(document
furnished by CCWD 4/07)