Jenny Lind/Rancho Calaveras 3/2007 - Status Report
Installing
a new Ethernet radio
Setting
up Communications to F Tank and LaContenta WWTP
Reviewing
quote/ Issuing PO
Purchased
soft starts for pumps to reduce water hammer
Received a new transfer switch for generator. Added
features for over current/voltage
Undercurrent/voltage
and spikes
Ordered
new
Hired Design Engineer Consultant to design
Project
designed for 2700 feet of line 12” diameter pipe.
Alternative
bid for 7200 feet of line 12” diameter pipe.
Approved
CEQA categorical
exemption.
Move
Treosti and Baldwin Pressure Relief Valves (PRV) to Baldwin and McCauley to
take load off B Zone.
Move
Treosti and Usher PRV to
Cal
Trans has reviewed plans for permit.
Awaiting Cal Trans encroachment permit.
Applied for County encroachment permit. Responding to
Bid
documents prepared. Waiting for CalTrans
approval before finalizing.
Bid
Date:
Award
Date:
Construction
should be completed by summer 2007.
· 602 Tank foundation
constructed
· Site prep completed and tank fabricated
· Construction of new control building started
· Tank delivered
· Approximately 2-month
construction. Tank completion April 2007
· Project completion date is scheduled for
· OES approved
90-day time extension to
· Rebuilt one PRV. Need to
rebuild 7 more.
· Performed Preventative Maintenance (PM) on PRV’s
·
· Began flushing entire Jenny Lind system
· Pipeline work almost complete
Control panel submittals reviewed(60
day delivery time)
Building completed
PG & E upgrade released for construction
(Single Phase to Three Phase)
Filter
delivered and installed
Filter
building built
Programming
already started
VFD’s
for Raw Water installed
Filter
startup
Solids
handling startup August 2007
DOHS
Permit Amendment 90% complete
Two
new PRV’s constructed and operational